Constructing a Rail Overbridge (ROB) at Level Crossing 64 in Karunguzhi, Chennai – ₹29.5 Crore Project to be Completed by March 2025
Work to construct a rail overbridge (ROB) at a cost of ₹29.5 crore at level crossing 64 at Karunguzhi in Chengalpattu district commenced recently. The project will help local residents and farmers moving paddy to the rice mills in the locality. Sources in the Highways Department explained that the 847-m, two-lane ROB, with 22 spans, … Read more